Friday 4 April 2008

Rochdale Canal Re-opens

The Rochdale Canal has finally been re-opened between Locks 53 and 54 following vandalism to the bank in January.

Following the incident, local farmer Chris Jones was sent to prison for 3 months for breaching an earlier court injunction banning him from interfering further with the canal bank. [See earlier report]

The canal has remained closed since then until British Waterways engineers could arange access to the private land to inspect the damage and assess the safety of the canal.

Engineering assessments to inspect the canal have now been completed and the canal will re-open to navigation on Saturday 5th April 2008.


The photograph (above) of the location in January shows the repairs to the earlier breach and the disturbed bank to the right.

Boaters wishing to travel between Manchester and the Summit will need to phone BW on 01942 405700 to book passage through locks 83 to 65 and locks 37 to 36.

No comments:

Post a Comment

Please feel free to comment on this item.

If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.

If you have no URL you can leave that part blank.

Please do not post as "Anonymous".