The Ashton Canal will be closed for navigation between Locks 2 and 3 in Ancoats on Wednesday 16th March.
The pound will be de-watered to allow the connection to the new arm that forms part of the New Islington development. The stoppage will be between 7.00 am and 7.00 pm.
For any enquiries about this stoppage contact British Waterways on 01782 785703.
Bridge ready - we see !
ReplyDelete