Wednesday 17 July 2013

Short stoppages on Huddersfield Narrow


The Huddersfield Narrow Canal will be closed between Locks 10e and 11e at Milnsbridge on Friday 18th and Saturday 19th July to enable remedial work to be carried out. This is because of a continuing leak from this short pound. The water level needs to be right down to allow concreting and pointing work to take place. Passage will not be possible during this work.

Boats may be winded below Lock 9e or above Lock 16e, which are also suitable places to moor while waiting for the work to be completed.

A similar stoppage is currently taking place (17th and 18th July) between Locks 28e and 29e between Slaithwaite and Marsden. This is to enable pointing work to be carried out to reduce leakage.


The pound between Locks 10e and 11e at Milnsbridge.

No comments:

Post a Comment

Please feel free to comment on this item.

If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.

If you have no URL you can leave that part blank.

Please do not post as "Anonymous".