The towpath remains closed for a little longer, probably until Friday 29th November.
The repair work has included stabilisation of the embankment, relining the canal bed and reconstruction of the towpath and wash wall. The work has cost around £300,000.
Location of the re-opened canal at Rishton
No comments:
Post a Comment
Please feel free to comment on this item.
If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.
If you have no URL you can leave that part blank.
Please do not post as "Anonymous".