Pennine Waterways News

Saturday, 30 January 2010

Two Week Stoppage at Keadby

An unplanned stoppage will close Keadby Lock on the Stainforth and Keadby Canal for two weeks.

The stoppage, from 6th to 17th February, is to enable emergency repairs to be carried out to the controls of Keadby Lock Swing Bridge by Lincolnshire County Council.

Boats will still be able to travel along the length of the canal from Bramwith but there will be no access to or from the tidal River Trent during this period.


Keadby Swing Bridge

No comments:

Post a Comment

Please feel free to comment on this item.

If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.

If you have no URL you can leave that part blank.

Please do not post as "Anonymous".