Pennine Waterways News

Friday 28 September 2018

Bosley Locks to re-open

The Bosley flight on the Macclesfield Canal is to re-open on 6th October. Reservoir levels have improved following recent periods of rain, allowing the locks to be opened on a restricted basis.

Bosley Locks will be open at 8.00 am each day, with last entry onto the flight being at 1.00 pm. Boaters arriving at the locks after that time will need to wait until the next morning. These restrictions will be reviewed after the first week.

Bosley Locks will then close again on 5th November to allow work on Locks 8 and 12 to be completed.

Marple Locks on the Peak Forest Canal will remain closed until repairs at Lock 11 have been completed.

Lock 2 at Bosley

No comments:

Post a Comment

Please feel free to comment on this item.

If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.

If you have no URL you can leave that part blank.

Please do not post as "Anonymous".