The Canal and River Trust has announced that the gates will be craned out on 8th May and taken to Stanley Ferry workshop so that replicas can be made.
It is hoped that the new gates will be ready to be installed in the week beginning 20th May. The Canal and River Trust will issue a further update on 10th May.
Shepley Bridge Lock is on the Mirfield Cut between Cooper Bridge and Wakefield. For boaters held up by the stoppage, there are plenty of moorings along the Mirfield Cut above Shepley Bridge Lock, but a river section is below the lock. For boaters travelling westwards there are numerous mooring possibilities between Broad Cut and Thornhill Flood Lock.
Update Friday 10th May:
The lock gates have now been removed and taken to Stanley Ferry workshop so that new gates can be made.
Update Friday 17th May:
The new gates will be on site and ready to be craned in on Wednesday 22nd May.
Update Thursday 25th May:
The new gates have now been installed and the lock has re-opened to navigation.
Shepley Bridge Lock, Calder and Hebble Navigation
No comments:
Post a Comment
Please feel free to comment on this item.
If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.
If you have no URL you can leave that part blank.
Please do not post as "Anonymous".