The work will begin at 8.00 am on Friday and will involve stop planks being put in place so that the head of the lock can be de-watered. Pointing work will be carried out to reduce leaks through the lock walls. The lock will remain closed until 8.00 am on Saturday to allow the pointing to harden.
The stoppage has been timed to reduce the possible impact on boaters booked to pass through Standedge Tunnel.
Any enquiries should be made to Canal and River Trust on 03030 404040.
Lock 27e, Huddersfield Narrow Canal
No comments:
Post a Comment
Please feel free to comment on this item.
If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.
If you have no URL you can leave that part blank.
Please do not post as "Anonymous".