The top gate of Lock 5 on the Bosley lock flight, Macclesfield Canal, has been damaged by boat impact.
There will be a half day stoppage on Wednesday 12th August. Lock 5 will be closed between 7.00 and 11.00 am.
The pound between Locks 4 and 5 will be de-watered in order to inspect the gate to ensure the integrity of the pivot beneath the heel post.
Any enquiries regarding this stoppage should be made to BW on 01606 723800.
Lock 5 at Bosley
Tuesday, 11 August 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Please feel free to comment on this item.
If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.
If you have no URL you can leave that part blank.
Please do not post as "Anonymous".