Pennine Waterways News

Tuesday, 2 November 2010

Two Day Stoppage on Rochdale Nine in Manchester

The Rochdale Nine locks through the centre of Manchester will be closed for two days this week to enable paddles to be replaced.

The work will take place between 8.00 am on Wednesday 3rd November and 1.00 pm on Thursday 4th November 2010. During this period the canal will be closed to navigation along the whole of the "Rochdale Nine" section between Locks 84 and 92.

The stoppage is needed to replace paddles at Lock 86. The existing paddles are passing an excessive volume of water, making the lock difficult to operate. BW says that changing the paddles will stop the leaks and make the lock easier to operate.

During the stoppage, boats awaiting passage should moor at Piccadilly Basin above Lock 84 or in Castlefield on the Bridgewater Canal.

This stoppage will affect boaters navigating the Cheshire Ring. Enquiries about this stoppage should be made to BW on 01782 785703.


Lock 86, Rochdale Canal

No comments:

Post a Comment

Please feel free to comment on this item.

If you do not have a Blogger/Google etc account, then please click on "Name/URL" and type in your name or nickname.

If you have no URL you can leave that part blank.

Please do not post as "Anonymous".